The Stormwater Multi-Sector Permit
NYSDEC’s Multi-Sector General Permit (MSGP) for Stormwater Discharges Associated with Industrial Activities has recently been updated. The first time offering of this course will cover all the basic requirements and regulations of the current MSGP, and highlight the where changes were made to the previous version of the permit. The class, which will be co-presented with NYSDEC and Andy Sansone of Monroe County, will review the specific MSGP sectors, SWPPP preparation, and BMP’s. The preparation of the necessary forms to obtain MSGP permit coverage (NOI, ACR, Representative Outfall) will be presented, and the relationship between the MSGP and the MS4 permit will be explained. Specific sector, site, and BMP design examples and problems will be provided.
Co-Instructor: Andy Sansone, Industrial Waste Engineer, Monroe County Environmental Services