• Go to page content.
  • Go to main navigation.
  • Go to page subnavigation.
  • Go to section navigation.
Stormwater Phase II
A A R ▲
▲
Go to the Stormwater Phase II Home page
Go to the CNY RPDB Home page

Back to top

Home page graphic; not required for understanding of text.

Section navigation.

Back to top

Regulated SUA MS4s and the Construction Industry
  • CNY RPDB Home
  • Stormwater Phase II Overview
  • Stormwater Design Standards
    • NYS Standards & Specifications for Erosion & Sediment Control (July, 2016)
  • Syracuse Urban Area Maps
  • Stormwater Links
  • MS4 Annual Reporting Requirements
  • MS4 Workshops & Trainings
  • Stormwater Library
  • Contacts
 

Page Content.

  • Go to main navigation.
  • Go to page subnavigation.
  • Go to section navigation.
  • Back to top

Breadcrumb navigation:

  • Stormwater Phase II Home
  • ►Regulated SUA MS4s and the Construction Industry
  • ►Stormwater Design Standards
  • ►NYS Standards and Specifications for Erosion and Sediment Control (July, 2016)

NYS Standards and Specifications for Erosion and Sediment Control (July, 2016)

DEC has finalized updates to the New York State Standards and Specifications for Erosion and Sediment Control (Blue Book). The Blue Book provides standards and specifications for the selection, design and implementation of erosion and sediment control practices for the development of Erosion and Sediment Control Plans for the SPDES General Permit for Stormwater Discharges from Construction Activity. The 2016 NYS Standards and Specifications for E&S Control is available for download on the NYS DEC website. Read about the 2016 NYS Standards and Specifications for Erosion and Sediment Control  (0.92 MB) .

Central New York Regional Planning & Development Board
126 N. Salina St., Suite 200, Syracuse, NY 12302 Map
Phone: 315-422-8276 • Fax: 315-422-9051 •  
  • Go to page content.
  • Go to main navigation.
  • Go to page subnavigation.
  • Go to section navigation.
  • Back to top