The Oneida Lake and Watershed Management Plan

Oneida Creek Sub-Basin Sewer System Evaluations Report

  Adobe PDF logo (Adobe PDF) (These documents open in a new window.)

The research summarized in this report was conducted as part of the Oneida Lake Watershed Management Plan with funding from the EPA and DEC. The project was coordinated by Dan Ramer, Sanitary Engineer with the City of Oneida.

Download the full report. This file is 2,779 kb and will take approximately 6 minutes, 35 seconds to download on a 56k modem. If you have a dial-up connection, you may want to consider the alternatives below:

Report text 120 kb:  17 seconds
Report tables 115 kb:  16 seconds
Report figures:
Figure 1 402 kb:  57 seconds
Figure 2 450 kb: 1 minute, 3 seconds
Figure 3 454 kb: 1 minute, 4 seconds
Figure 4 444 kb: 1 minute, 3 seconds
Figure 5 428 kb: 1 minute
Figure 6 199 kb:  28 seconds
Figure 7 179 kb:  25 seconds


For more information on the Oneida Lake Watershed Management Plan activities e-mail the Central New York Regional Planning Board.

Back to top